What was found
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE SKIN CORRODED BETWEEN BS 951 AND BS 960, STR 27L. REPAIRED SKIN PER ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE SKIN CORRODED BETWEEN BS 951 AND BS 960, STR 27L. REPAIRED SKIN PER ER.