What was found
DURING SCHEDULED 8Y CHECK, FOUND RT WING NR 7 FLAP TRACK BOLT CORRODED. REPAIRED FLAP TRACK PER SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 8Y CHECK, FOUND RT WING NR 7 FLAP TRACK BOLT CORRODED. REPAIRED FLAP TRACK PER SWA EA.