What was found
DURING SCHEDULED BRIDGE CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 277, STR 16R. REMOVED AND REPLACED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED BRIDGE CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 277, STR 16R. REMOVED AND REPLACED FRAME PER SRM.