What was found
DURING SCHEDULED BRIDGE CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 500D, STR 28R. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED BRIDGE CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 500D, STR 28R. REMOVED AND REPLACED SHEAR TIE PER SRM.