What was found
DURING SCHEDULED C2 CHECK, FOUND RT FUSELAGE KEEL BEAM CORRODED FROM BS 500C TO BS 540. REMOVED AND REPLACED KEEL BEAM SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C2 CHECK, FOUND RT FUSELAGE KEEL BEAM CORRODED FROM BS 500C TO BS 540. REMOVED AND REPLACED KEEL BEAM SECTION PER SRM.