What was found
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR CUTOUT FWD FRAME CRACKED AT BS NR 5 DOOR STOP. REMOVED AND REPLACED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR CUTOUT FWD FRAME CRACKED AT BS NR 5 DOOR STOP. REMOVED AND REPLACED FRAME PER SRM.