What was found
DURING SCHEDULED BRDG CHECK, FOUND L1 DOOR FRAME CUTOUT AFT FRAME CRACKED AT NR 5 DOOR STOP. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED BRDG CHECK, FOUND L1 DOOR FRAME CUTOUT AFT FRAME CRACKED AT NR 5 DOOR STOP. REPAIRED FRAME PER SRM.