What was found
DURING SCHEDULED 22Y CHECK, FOUND SHEAR TIE CORRODED AT BS 500D, RBL 11 TO RBL 13. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 22Y CHECK, FOUND SHEAR TIE CORRODED AT BS 500D, RBL 11 TO RBL 13. REMOVED AND REPLACED SHEAR TIE PER SRM.