What was found
DURING SCHEDULED SPV CHECK, FOUND SHEAR TIE CORRODED AT BS 500, LBL 25 TO LBL 29. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND SHEAR TIE CORRODED AT BS 500, LBL 25 TO LBL 29. REPAIRED SHEAR TIE PER SRM.