What was found
DURING SCHEDULED C2 CHECK, FOUND SHEAR TIE CORRODED AT BS 500C, STR 26R. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C2 CHECK, FOUND SHEAR TIE CORRODED AT BS 500C, STR 26R. REPAIRED SHEAR TIE PER SRM.