What was found
DURING SCHEDULED SPV CHECK, FOUND LONGITUDINAL FLOORBEAM UPPER TEE CHORD CRACKED BETWEEN BS 655 AND BS 675, LBL 25. R&R CHORD PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND LONGITUDINAL FLOORBEAM UPPER TEE CHORD CRACKED BETWEEN BS 655 AND BS 675, LBL 25. R&R CHORD PER SRM.