What was found
DURING SCHEDULED SPV CHECK, FOUND STUB FRAME CRACKED AT BS 291, STR 18R. REMOVED AND REPLACED STUB FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND STUB FRAME CRACKED AT BS 291, STR 18R. REMOVED AND REPLACED STUB FRAME PER SRM.