What was found
DURING SCHEDULED SPV CHECK, FOUND STRINGER 28R CORRODED AT BS 302. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND STRINGER 28R CORRODED AT BS 302. REPAIRED FRAME PER SRM.