What was found
DURING SCHEDULED SPV CHECK, FOUND STRINGER 22R CORRODED BETWEEN BS 933 AND BS 944. REPAIRED STRINGER PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND STRINGER 22R CORRODED BETWEEN BS 933 AND BS 944. REPAIRED STRINGER PER SRM.