What was found
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM CORRODED BETWEEN RT BS 493 TO BS 500. REPAIRED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM CORRODED BETWEEN RT BS 493 TO BS 500. REPAIRED BEAM PER SRM.