What was found
DURING SCHEDULED 8Y CHECK, FOUND CREASE BEAM CHORD CORRODED AT BETWEEN BS 291 TO BS 328, RBL 54. REMOVED AND REPLACED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 8Y CHECK, FOUND CREASE BEAM CHORD CORRODED AT BETWEEN BS 291 TO BS 328, RBL 54. REMOVED AND REPLACED BEAM PER SRM.