What was found
DURING SCHEDULED SPV CHECK, FOUND RT KEEL BEAM CORRODED AT BETWEEN 500D TO BS 520. REPAIRED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND RT KEEL BEAM CORRODED AT BETWEEN 500D TO BS 520. REPAIRED BEAM PER SRM.