What was found
DURING SCHEDULED 10Y CHECK, FOUND FLOORBEAM TEE CAP CRACKED AT BS 540, LBL 1. REPAIRED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 10Y CHECK, FOUND FLOORBEAM TEE CAP CRACKED AT BS 540, LBL 1. REPAIRED BEAM PER SRM.