What was found
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE FRAME CRACKED AT L2 DOOR LOWER AFT ENTRY CUTOUT. REMOVED AND REPLACED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE FRAME CRACKED AT L2 DOOR LOWER AFT ENTRY CUTOUT. REMOVED AND REPLACED FRAME PER SRM.