What was found
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM WEB CORRODED AT BS 397, RBL 70, WL 208. REPAIRED WEB PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM WEB CORRODED AT BS 397, RBL 70, WL 208. REPAIRED WEB PER SRM.