What was found
DURING SCHEDULED MV2 CHECK, FOUND SHEAR TIE CORRODED AT BS 294, BETWEEN LBL 2 TO LBL 6. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MV2 CHECK, FOUND SHEAR TIE CORRODED AT BS 294, BETWEEN LBL 2 TO LBL 6. REPAIRED SHEAR TIE PER SRM.