What was found
DURING SCHEDULED 24Y CHECK, FOUND FRAME CORRODED AT BS 480, RBL 13. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND FRAME CORRODED AT BS 480, RBL 13. REPAIRED FRAME PER SRM.