What was found
DURING SCHEDULED SPV CHECK, FOUND KEEL BEAM CORRODED BETWEEN BS 515 TO BS 520, LBL 7. REMOVED AND REPLACED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND KEEL BEAM CORRODED BETWEEN BS 515 TO BS 520, LBL 7. REMOVED AND REPLACED BEAM PER SRM.