What was found
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CORRODED AT BS 827, BETWEEN RBL 16 TO RBL 20. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CORRODED AT BS 827, BETWEEN RBL 16 TO RBL 20. REPAIRED SHEAR TIE PER SRM.