What was found
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM CORRODED AT BS 865, LBL 65, WL 208. REPAIRED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM CORRODED AT BS 865, LBL 65, WL 208. REPAIRED BEAM PER SRM.