What was found
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CORRODED AT BS 500A, BETWEEN STR 15R TO STR 16R. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CORRODED AT BS 500A, BETWEEN STR 15R TO STR 16R. REPAIRED SHEAR TIE PER SRM.