What was found
DURING SCHEDULED MV2 CHECK, FOUND SHEAR TIE CRACKED AT BS 500D, STR 14L. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MV2 CHECK, FOUND SHEAR TIE CRACKED AT BS 500D, STR 14L. REPAIRED SHEAR TIE PER SRM.