What was found
DURING SCHEDULED 24Y CHECK, FOUND CREASE BEAM CRACKED AT BS 620, RBL 63. REMOVED AND REPLACED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND CREASE BEAM CRACKED AT BS 620, RBL 63. REMOVED AND REPLACED BEAM PER SRM.