What was found
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM WEB CORRODED BETWEEN BS 747 TO BS 767, STR 17L. REPAIRED WEB PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM WEB CORRODED BETWEEN BS 747 TO BS 767, STR 17L. REPAIRED WEB PER SRM.