What was found
DURING SCHEDULED OTS CHECK, FOUND SHEAR TIE CORRODED AT BS 747, BETWEEN STR 25L TO STR 26L. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED OTS CHECK, FOUND SHEAR TIE CORRODED AT BS 747, BETWEEN STR 25L TO STR 26L. REPAIRED SHEAR TIE PER SRM.