What was found
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR, NR 2 O/B TEE CHORD CRACKED. REMOVED AND REPLACED CHORD PER BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR, NR 2 O/B TEE CHORD CRACKED. REMOVED AND REPLACED CHORD PER BAC DWG.