What was found
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE SHEAR TIE CRACKED AT BS 500D, STR 25L TO STR 26L. REPAIRED SHEAR TIE PER ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE SHEAR TIE CRACKED AT BS 500D, STR 25L TO STR 26L. REPAIRED SHEAR TIE PER ER.