What was found
DURING SCHEDULED HC2 CHECK, FOUND NR 2 L/E SLAT T/E WEDGE DELAMINATED. REPAIRED SLAT PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED HC2 CHECK, FOUND NR 2 L/E SLAT T/E WEDGE DELAMINATED. REPAIRED SLAT PER SRM.