What was found
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE FRAME SHEAR TIE CRACKED AT BS 400, STR 15L TO STR 16L. REPAIRED FRAME SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE FRAME SHEAR TIE CRACKED AT BS 400, STR 15L TO STR 16L. REPAIRED FRAME SHEAR TIE PER SRM.