What was found
DURING SCHEDULED SPV CHECK, FOUND FRAME CRACKED AT BS 500C, STR 13R. REPAIRED FRAME PER EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND FRAME CRACKED AT BS 500C, STR 13R. REPAIRED FRAME PER EA.