What was found
DURING SCHEDULED SPV CHECK, FOUND LT KEEL BEAM CORRODED AT BS 741. REMOVED AND REPLACED KEEL BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND LT KEEL BEAM CORRODED AT BS 741. REMOVED AND REPLACED KEEL BEAM PER SRM.