What was found
DURING SCHEDULED SPV CHECK, FOUND LT CREASE BEAM CORRODED AT BS 917, STR 17L. REMOVED AND REPLACED WEB PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND LT CREASE BEAM CORRODED AT BS 917, STR 17L. REMOVED AND REPLACED WEB PER SRM.