What was found
DURING SCHEDULED SPV CHECK, FOUND RT KEEL BEAM SPLICE CRACKED AT BS 741. R&R BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND RT KEEL BEAM SPLICE CRACKED AT BS 741. R&R BEAM PER SRM.