What was found
DURING SCHEDULED 8Y CHECK, FOUND R1 DOOR CUTOUT FWD FRAME CRACKED AT BS 295. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 8Y CHECK, FOUND R1 DOOR CUTOUT FWD FRAME CRACKED AT BS 295. REPAIRED FRAME PER SRM.