What was found
DURING SCHEDULED SPV CHECK, FOUND VERTICAL STIFFENER CRACKED AT BS 639, LBL 45. REMOVED AND REPLACED STIFFENER PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND VERTICAL STIFFENER CRACKED AT BS 639, LBL 45. REMOVED AND REPLACED STIFFENER PER SRM.