What was found
DURING SCHEDULED SPV CHECK, FOUND LT KEEL BEAM CORRODED BETWEEN BS 500D TO BS 540.6. REMOVED AND REPLACED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND LT KEEL BEAM CORRODED BETWEEN BS 500D TO BS 540.6. REMOVED AND REPLACED BEAM PER SRM.