What was found
DURING SCHEDULED 22Y CHECK, FOUND R1 DOOR FWD FRAME CRACKED AT BS 329. REMOVED AND REPLACED R1 DOOR FRAME PER SRM & BAC DRAWING.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 22Y CHECK, FOUND R1 DOOR FWD FRAME CRACKED AT BS 329. REMOVED AND REPLACED R1 DOOR FRAME PER SRM & BAC DRAWING.