What was found
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM CORRODED BETWEEN BS 500B TO BS 500C. REMOVED AND REPLACED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND CREASE BEAM CORRODED BETWEEN BS 500B TO BS 500C. REMOVED AND REPLACED BEAM PER SRM.