What was found
DURING SCHEDULED MV2 CHECK, FOUND T/E FLAP NR 2 SPINDLE CRACKED. REMOVED AND REPLACED NR 2 SPINDLE PER MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MV2 CHECK, FOUND T/E FLAP NR 2 SPINDLE CRACKED. REMOVED AND REPLACED NR 2 SPINDLE PER MM.