What was found
DURING SCHEDULE 26Y CHECK, FOUND FRAME CRACKED AT BS 500C, BETWEEN STR 20L TO STR 21L. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULE 26Y CHECK, FOUND FRAME CRACKED AT BS 500C, BETWEEN STR 20L TO STR 21L. REPAIRED FRAME PER SRM.