What was found
DURING SCHEDULED 26Y CHECK, FOUND AFT CARGO CREASE BEAM CORRODED. REPAIRED BEAM PER SRM AND BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 26Y CHECK, FOUND AFT CARGO CREASE BEAM CORRODED. REPAIRED BEAM PER SRM AND BAC DWG.