What was found
DURING SCHEDULED 16Y CHECK, FOUND CROSS FLOORBEAM CORRODED AT BS 986.5, BETWEEN RBL 52 TO LBL 52. REPAIRED BEAM PER TI.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 16Y CHECK, FOUND CROSS FLOORBEAM CORRODED AT BS 986.5, BETWEEN RBL 52 TO LBL 52. REPAIRED BEAM PER TI.