What was found
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CRACKED AT BS 616, BETWEEN STR 7L TO STR 8L. REMOVED AND REPLACED SHEAR TIE PER SRM AND BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CRACKED AT BS 616, BETWEEN STR 7L TO STR 8L. REMOVED AND REPLACED SHEAR TIE PER SRM AND BAC DWG.