What was found
DURING SCHEDULED 22Y CHECK, FOUND SHEAR TIE CRACKED AT BS 277, STR 10L. REMOVED AND REPLACED SHEAR TIE PER SRM AND EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 22Y CHECK, FOUND SHEAR TIE CRACKED AT BS 277, STR 10L. REMOVED AND REPLACED SHEAR TIE PER SRM AND EA.