What was found
DURING SCHEDULED 22Y CHECK, FOUND BULKHEAD VERTICAL STIFFENER CRACKED AT BS 727, RBL 5.5. REMOVED AND REPLACED STIFFENER PER SRM AND BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 22Y CHECK, FOUND BULKHEAD VERTICAL STIFFENER CRACKED AT BS 727, RBL 5.5. REMOVED AND REPLACED STIFFENER PER SRM AND BAC DWG.